Copyright ©2024 Wuxi Rigid Machinery Co., Ltd. Record number: SuICPBei xxxxxx Website construction: Wuxi Wangke
2:1 Elevator Car Process
① Diverter pulley 2:1 Process standard configuration; Equipped with telescopic rods for easy suspension outside the shaft. ② Climber installation bracket The bracket is fastened to the middle of the car ceiling beam and can be equipped with climbers and safety locks. ③ High speed climber LTD100-10P18 Electric Control Integrated Cable Climber, at a speed of 18m/min. ④ Overspeed safety lock OSL512 Overspeed safety lock with a rated load of 1,600kg; The platform will automatically lock when it descends more than 30m/min; Applying Ф11.5 high-strength steel wire rope. ⑤ Steel Wire Rope Guide Installed on the bracket and guiding the steel wire rope towards the side of the elevator car. ⑥ Steel Wire Rope and Rope Collection Reeler For climbers Ф 10.2 steel wire rope and its winding device; The length of the steel wire rope should be configured to at least twice of the shaft height. ⑦ Elevator car ceiling platform Aluminum protective railings should be installed around the platform. ⑧ Anti-derailment protection system The climber control box is equipped with an anti-derailment switch socket. The anti-derailment switch component should be connected to the climber and installed on the platform to support the guide rail laterally. ⑨ Safety tong assembly The second descent protection of the platform is achieved by manually triggering the Safety tong trigger or automatically triggering the speed limiter. ⑩ Heavy hammer Maintaining the safety lock wire rope vertically suspended. ⑪ Guiding pulley Installed on both sides of the pit, maintaining the safety lock of the climber and the vertical suspension of the steel wire rope; Maintain 2:1 process mode, the steel wire rope should not be entangled. |