Copyright ©2024 Wuxi Rigid Machinery Co., Ltd. Record number: SuICPBei xxxxxx Website construction: Wuxi Wangke
Process 2:1 False car
① Diverter Pulley 2:1. Process standard configuration; Configured with telescopic rods for easy suspension outside the shaft. ② Canopy Effectively preventing high-altitude falling objects, high-strength steel telescopic roof. ③ High speed climber LTD100-10P18 electric control integrated climber, with a speed of 18m/min; connected to the false car platform mounting bracket through a dedicated adapter; ④ Overspeed safety lock OSL512 overspeed safety lock with a rated load of 1,600kg; The platform will automatically lock when it descends more than 30m/min; Apply Ф 11.5 high strength steel wire rope. ⑤ Wire rope and rope retraction device For climbers Ф 10.2 steel wire rope and its winding device; The length of the steel wire rope should be configured to at least twice of the shaft height. ⑥ Work Platform
Aluminum protective railings should be installed around the platform; The bottom plate is made of wood, and the thickness should not be less than 18mm; The steel support frame and platform can bear 1,000kg. ⑦ Anti-derailment protection system The climber control box is equipped with an anti-derailment switch socket. The anti- derailment switch component should be connected to the climber and installed on the platform to support the guide rail laterally. ⑧ Safety tong assembly When the steel wire rope of the climber is released, it will automatically lock the platform, which is the second line of fall protection for the platform. ⑨ Heavy hammer Maintaining the safety lock wire rope vertically suspended. ⑩ Diverter counter weight Maintaining the climber and hanging the steel wire rope vertically; Maintaining the steel wire rope not be entangled under 2:1 process mode. |